REVOLUTION 1098 — Report of October 14, 2011


 
 Perigee Passage at start : 2011-10-10T13:45:03 
 Perigee Passage at end   : 2011-10-13T13:32:30   	
 Radiation Belt exit      : 45631 km (ijd 4300.6926)
 Radiation Belt entrance  : 22863 km (ijd 4303.5201)
 
 Operations Coordinator   : Enrico Bozzo
 Pipeline Operator        : Ph.M.
 Scientist on Duty        : Adam Frankowski
 
 S/W version		  : isdc-core-sw-0.3_2011-08-08T09:21:05
 -----------

 1. Planning summary
 ===================

 1.1 General remarks

 a) JEM-X 1 and 2 on.

 1.2 Pointings summary

   Remarks: Only Science Windows (ScWs) of type 'pointing' are considered.
 - Exposures info from POD version 1. Pointings info from TSF version 2. 
 - Durations given in the executed/planned format; data gaps and bad time
   intervals not excluded from total durations.
 - Deviations: only unexpected deviations >30 secs for pointings assigned to
   an exposure are reported; expected deviations (first & last pointings of
   an exposure longer than planned) not reported.   
  • Exposure 10980001: 'GRS 1915+105', hexagon (7x2858s) 7 pointings: 10980002 -> 10980008, 20180s/20006s (+2m53s)
  • Exposure 10980002: 'SN2011fe', 5x5 (26x3334s) 26 pointings: 10980010 -> 10980035, 88271s/86684s (+26m27s)
  • Exposure 10980003: 'SN2011fe', 5x5 (2x3334s) 2 pointings: 10980036 -> 10980037, 6672s/6668s (+3s)
  • Exposure 10980004: 'SN2011fe', 5x5 (14x3334s) 14 pointings: 10980038 -> 10980051, 50541s/46676s (+1h04m24s)
  • Exposure 10980005: 'SN2011fe', 5x5 (16x3334s) 16 pointings: 10980052 -> 10980067, 56995s/53344s (+1h00m50s)
  • Pointings with no assigned Exposure 4 pointings: 10980001, 0009, 0068, 0069, 1832s/1923s (-1m30s)
2. NRT Data processing ====================== 2.1 Telemetry * Start reception: 2011-10-10T14:56:39 End reception: 2011-10-13T12:27:51 * TM gaps of more than 30 seconds: 2011-10-11T23:27:24 2011-10-12T00:50:16 * Frames missed: 2011-10-11T23:27:24 249 frames missed (3308022466 to 3308022714) 2011-10-11T23:27:24 222 frames missed (3308022775 to 3308022996) 2011-10-12T00:50:16 259 frames missed (3308101925 to 3308102183) 2011-10-12T00:50:16 320 frames missed (3308102231 to 3308102550) 2011-10-13T15:56:24 507 frames missed (3310225799 to 3310226305) * ERT not in sync with UTC: - * Statistics: Mean Rate: 15.99 frames/sec (mean) Frames: 4001170 total Packets: 5739005 total : 0 missed : 3005 missed : 2860480 TM : 5720960 TM : 1140690 idle : 0 tcmd : 0 invalid : 18045 time : 0 idle : 0 invalid * Errors: NCTRSFRAME: invalid quality = 256 (should be 0 or 1): 2011-10-10T15:01:17 (perigee) 2011-10-11T05:05:34 - 2011-10-11T05:05:58 2011-10-11T12:03:50 - 2011-10-11T12:03:57 2011-10-11T17:24:58 - 2011-10-11T17:25:01 2011-10-12T04:31:00 - 2011-10-12T04:31:49 2011-10-12T18:15:45 - 2011-10-12T18:16:29 2011-10-13T12:26:44 (perigee) 2.2 Auxiliary files summary POD OPP TSF PAF OLF ASF AHF THF ORB REVNO ----------------------------------------------------------- 1 1 1 1 72 71 1 71 1 1 2.3 Pre-processing * Frequent errors for days 2011-10-11, 2011-10-12, 2011-10-13, respectively: 23 22 16 "Histogram rejected" 0 0 0 "OBT found too much higher" 2 2 3 "packet(s) of the Histogram are discarded" 0 1 2 "Can not store the Histogram" 2 0 2 "SpiSpectrum, decompression failed" 2 0 2 "SpiSpectrumParser, Failure" * No other error 2.4 OPUS Pipelines processing * REV: completed | errors * INPUT/SCW: completed | errors ------------------------------- ---------------------------- IREM : 69 | 0 145 | 0 ISGRI_cal : 24 | 0 ISGRI_noise: 138 | 0 IBIS_veto : 22 | 0 * QLA completed | errors PICsIT_cal : 60 | 0 ----------------------------- JMX : 280 | 0 IBIS : 71 | 0 ilt : 1 | 0 JEMX-1 : " | 0 Archiving : 1 | 0 JEMX-2 : " | 0 2.5 ISGRI context table 2011-10-13T11:17: IIMG_SDCMOC_D20111010173807_00001.INT sent to MOC 3. Alerts ========= * Level 1: 5022 Electronic calibration: 1 amplifier(s) changed slope value Program / version that has created this alert: j_calib_adc 2.2 Directory of alert generation: /export/isdc/run/pipelines/nrt/nrtrev/scratch/1098_20111010172446_00_j2e JMX2: Revolution 1098 electronic calibration: Amp(s) changed slope significantly: VETO2 -> e-mail to JEM-X team 4. Instruments checks ===================== Nothing special 5. Science (AF) ========== 5.1 Summary a) Planned observations Last POD file: /isdc/nrt/ops/aux/adp/1098.000/pod_1098_0001.fits Received at : 30 Sep 07:54 i EXP_ID OBS_ID SRC_NAME POINT_NUM POINT_LEN 1 10980001 08200250017 GRS 1915+105 7 2858 2 10980002 08700040001 SN2011fe 26 3334 3 10980003 08700040001 SN2011fe 2 3334 4 10980004 08700040001 SN2011fe 14 3334 5 10980005 08700040001 SN2011fe 16 3334 b) Solar activity & miscellaneous low (GOES15 1-8 A flux level B-C) 5.2 IBAS a) GRB in ISGRI FOV: None b) GRB in SPI-ACS: 2011-10-12T10:56:35: Possible GRB. Also detected by Fermi/GBM 2011-10-12T19:27:36: Possible GRB. Also detected by Fermi/GBM c) Other IBAS alerts: None 5.3 TOOs None