ISDC END OF REVOLUTION REPORT (NRT)
REVOLUTION 1217 - Report of October 3, 2012
Perigee Passage at start : 2012-09-30T12:27:47
Perigee Passage at end : 2012-10-03T12:14:24
Radiation Belt exit : 43757 km (ijd 4656.6336)
Radiation Belt entrance : 26603 km (ijd 4659.6550)
Operations Coordinator : Carlo Ferrigno, Enrico Bozzo
Pipeline Operator : Ph.M.
Scientist on Duty : Valentino Esposito, Marc Tuerler
1. Planning summary
===================
1.1 General remarks
a) JEM-X 1 and 2 on.
b) 2012-10-02T08:29: PICsIT reset followed by a HEPI resync.
1.2 Pointings summary
Remarks: Only Science Windows (ScWs) of type 'pointing' are considered.
- Exposures info from POD version 6. Pointings info from TSF version 5.
- Durations in exec/planned format; data gaps and bad time intervals not excluded from total time.
- Deviations: only unexpected deviations >30 secs for pointings assigned to an exposure reported;
expected deviations (first & last pointings of an exposure longer than planned) not reported.
- Exposure 12170001: 'Sw J174510.8-262411', 5x5 (33x3334s)
33 pointings: 12170004 -> 12170036, 110160s/110022s (+2m18s)
- Exposure 12170002: 'Sw J174510.8-262411', 5x5 (11x3334s)
11 pointings: 12170037 -> 12170047, 36679s/36674s (+4s)
- Exposure 12170003: 'Sw J174510.8-262411', 5x5 (22x3334s)
22 pointings: 12170049 -> 12170070, 75328s/73348s (+33m00s)
- Pointings with no assigned Exposure
6 pointings: 12170001, 0002, 0003, 0048, 0071, 0072 16569s/3281s (+3h41m28s)
2. NRT Data processing
======================
2.1 Telemetry
* Start reception: 2012-09-30T13:39:18
End reception: 2012-10-03T10:46:32
* TM gaps of more than 30 seconds:
2012-09-30T13:49:23
2012-09-30T14:45:36
2012-09-30T15:10:16
2012-09-30T15:43:34
2012-10-02T10:11:31
2012-10-02T12:06:30 - 2012-10-02T12:07:01
2012-10-02T12:16:09 - 2012-10-02T12:17:42
2012-10-02T12:29:13
2012-10-02T16:17:26
* Frames missed:
2012-09-30T13:49:24 659 frames missed (3775685681 to 3775686339)
2012-09-30T14:45:36 254 frames missed (3775739804 to 3775740057)
2012-09-30T14:45:36 183 frames missed (3775740112 to 3775740294)
2012-09-30T15:10:16 516 frames missed (3775763469 to 3775763984)
2012-09-30T15:43:34 278 frames missed (3775795378 to 3775795655)
2012-09-30T15:43:34 253 frames missed (3775795686 to 3775795938)
2012-10-02T10:11:31 278 frames missed (3778241027 to 3778241304)
2012-10-02T10:11:31 577 frames missed (3778241335 to 3778241911)
2012-10-02T12:06:30 175 frames missed (3778351587 to 3778351761)
2012-10-02T12:07:01 635 frames missed (3778351839 to 3778352473)
2012-10-02T12:07:02 252 frames missed (3778352540 to 3778352791)
2012-10-02T12:16:09 157 frames missed (3778360804 to 3778360960)
2012-10-02T12:16:40 641 frames missed (3778361038 to 3778361678)
2012-10-02T12:17:11 357 frames missed (3778361755 to 3778362111)
2012-10-02T12:17:42 549 frames missed (3778362196 to 3778362744)
2012-10-02T12:17:42 218 frames missed (3778362812 to 3778363029)
2012-10-02T12:29:13 248 frames missed (3778373518 to 3778373765)
2012-10-02T12:29:13 282 frames missed (3778373824 to 3778374105)
2012-10-02T16:17:26 659 frames missed (3778592518 to 3778593176)
* ERT not in sync with UTC: -
* Statistics: Mean Rate: 15.97 frames/sec (mean)
Frames: 3972671 total Packets: 6096646 total
: 0 missed : 8362 missed
: 3039362 TM : 6078724 TM
: 933309 idle : 0 tcmd
: 0 invalid : 17922 time
: 0 idle
: 0 invalid
* Errors:
NCTRSFRAME: invalid quality = 256 (should be 0 or 1):
2012-09-30T13:39:21
2012-09-30T13:45:20 - 2012-09-30T13:45:22
2012-10-01T07:22:07 - 2012-10-01T07:22:08
2012-10-02T18:41:16 - 2012-10-02T18:41:18
2012-10-03T04:09:34 - 2012-10-03T04:09:36
2012-10-03T09:45:08
2012-10-03T10:40:04
2.2 Auxiliary files summary
POD OPP TSF PAF OLF ASF AHF THF ORB REVNO
-------------------------------------------------------------
2 2 1 1 72 74 1 98 1 1
2.3 Pre-processing
* Frequent errors for days 2012-10-01, 2012-10-02, 2012-10-03, respectively:
24 24 16 "Histogram rejected"
0 0 0 "OBT found too much higher"
0 4 2 "packet(s) of the Histogram are discarded"
0 1 0 "Can not store the Histogram"
0 0 0 "SpiSpectrum, decompression failed"
0 0 0 "SpiSpectrumParser, Failure"
2.4 OPUS Pipelines processing
* REV: completed | errors * INPUT/SCW: completed | errors
------------------------------- ----------------------------
IREM : 68 | 0 149 | 0
ISGRI_cal : 24 | 0
ISGRI_noise: 137 | 0
IBIS_veto : 22 | 0 * QLA completed | errors
PICsIT_cal : 61 | 0 -----------------------------
JMX : 278 | 0 IBIS : 74 | 0
ilt : 1 | 0 JEMX-1 : " | 0
Archiving : 1 | 0 JEMX-2 : " | 0
2.5 ISGRI context table
2012-10-02T15:31: IIMG_SDCMOC_D20120930162452_00001.INT sent to MOC
2012-10-03T08:42: IIMG_SDCMOC_D20120930162452_00002.INT sent to MOC
2nd version provided by IRFU/SAp, Saclay (F)
3. Alerts
=========
Nothing relevant
3.2 Parameter out of limits
IBIS:
-----
PICsIT spurious reset in ScW 121700450010
P0S_MM[1-8]LTC1
P0S_MM[1-8]LTC2
P0S_MM[1-8]RTC1
P0S_MM[1-8]RTC2
P0E_MMMCRER
3.3 Missing scientific data
Nothing relevant
4. Instruments checks (IOSM)
=====================
Nothing special
5. Science (MT)
==========
5.1 Summary
a) Planned observations
Last POD file: /isdc/nrt/ops/aux/adp/1217.000/pod_1217_0006.fits
Received at : 26 Sep 15:23
i EXP_ID OBS_ID SRC_NAME POINT_NUM POINT_LEN
1 12170001 09400050048 Sw J174510.8-262411 33 3334
2 12170002 09400050048 Sw J174510.8-262411 11 3334
3 12170003 09400050048 Sw J174510.8-262411 22 3334
b) Solar activity & miscellaneous
5.2 IBAS
a) GRB in ISGRI FOV: No
b) GRB in SPI-ACS:
2012-10-01T18:07:15 (AUTO): Possible GRB121001A
c) Other IBAS alerts: No
5.3 TOOs
None
6. Anomalies report:
====================
No anomaly
|